Change language:
 

Reference object

Mora lasarett
Project Mora lasarett, 6 elevators in the traffic system. Modernization of 2 passenger lifts and 4 bed/transport lifts in the main building to increase the availability, reliability and energy efficiency. The modernization includes a refurbishment with new gearless machines including controllers, enclosures, sensors, new automatic car and landing doors, new finishes, control panels, etc. All elevators have 9 landings with a single automatic door. In the engine, a computer has been placed installed with WinMOS for monitoring of the lifts so that operators can easily search for information. Moreover, it is connected with the 4G modem for remote connection.



<< Go back